Order ID:89JHGSJE83839 | Style:APA/MLA/Harvard/Chicago | Pages:5-10 |
Instructions:
BADM 627 Project Risk and Quality Management is a course in which you will learn how to manage project risks and quality.
Set #7 of Problems
Your Full Name
Date
Assignment Guidelines Table of Contents 3 Questions 13; 23; 33; 33; 44; 44; 44; 44
Instructions for the Assignment
Question 1: Create a thorough risk management plan, including a complete risk matrix, for a wedding project that includes the wedding, reception, and dinner. This event is being planned by your wedding planning firm.
Question 2: Write a three-page paper that includes three references in addition to your material. Explain the relationship between risk control and quality in the context of project management. What is the relationship between the two fields of knowledge? From a strategic standpoint, describe the effort in these two areas.
Question 3: What role does monitoring and control play in risk management? What role would project communication play in this? Create a sample project communication plan that incorporates a RACI as part of the strategy. At least ten different people and organizations must be included in the project’s messaging.
References
P. J. Edwards, P. V. Serra, and M. Edwards (2019). Taking care of project hazards Wiley-Blackwell, Hoboken, NJ.
Project Management Institute, Project Management Institute Inc., A guide to the project management body of knowledge (PMBOK® guide), Fifth Edition, 2013. [This is the Vitalsource version.] https://online.vitalsource.com/#/books/9781935589815/cfi/0 was retrieved from https://online.vitalsource.com/#/books/9781935589815/cfi/0
RUBRIC |
||||||
Excellent Quality 95-100%
|
Introduction
45-41 points The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned. |
Literature Support 91-84 points The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned. |
Methodology 58-53 points Content is well-organized with headings for each slide and bulleted lists to group related material as needed. Use of font, color, graphics, effects, etc. to enhance readability and presentation content is excellent. Length requirements of 10 slides/pages or less is met. |
|||
Average Score 50-85% |
40-38 points More depth/detail for the background and significance is needed, or the research detail is not clear. No search history information is provided. |
83-76 points Review of relevant theoretical literature is evident, but there is little integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are included. Summary of information presented is included. Conclusion may not contain a biblical integration. |
52-49 points Content is somewhat organized, but no structure is apparent. The use of font, color, graphics, effects, etc. is occasionally detracting to the presentation content. Length requirements may not be met. |
|||
Poor Quality 0-45% |
37-1 points The background and/or significance are missing. No search history information is provided. |
75-1 points Review of relevant theoretical literature is evident, but there is no integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are not included in the summary of information presented. Conclusion does not contain a biblical integration. |
48-1 points There is no clear or logical organizational structure. No logical sequence is apparent. The use of font, color, graphics, effects etc. is often detracting to the presentation content. Length requirements may not be met |
|||
You Can Also Place the Order at www.collegepaper.us/orders/ordernow or www.crucialessay.com/orders/ordernow
BADM 627 Project Risk and Quality Management |
BADM 627 Project Risk and Quality Management