Change Control and Configuration Management Project
Order ID:89JHGSJE83839 Style:APA/MLA/Harvard/Chicago Pages:5-10 Instructions:
Change Control and Configuration Management Project
Choose any four ‘causes’ of change within a project in table 9.1 in the text. Provide a project example and scenario, and describe the impact of each change. Was there a level of change control in the project examples that tracked ownership, documentation and approval of these changes?
Required Readings
Read the following chapters in Cost and Value Management in Projects:
Chapter 9: Change Control and Configuration Management
Read the contents on the Scope and Change Control (Links to an external site.) website, which provides a review of key concepts in change control with case studies and graphs to coincide with the readings and discussions for the week.