The identification of all changes to a project is only the first step for ensuring a control system is in place. Describe the detailed steps you would implement for your project to ensure an entire change control process is in place. Consider the following topics in your answer: documentation, analysis, approval and implementation. Why is the baseline configuration important to this topic?
Required Readings
Read the following chapters in Cost and Value Management in Projects:
Chapter 9: Change Control and Configuration Management
Read the contents on the Scope and Change Control (Links to an external site.) website, which provides a review of key concepts in change control with case studies and graphs to coincide with the readings and discussions for the week.