Project Management case study Assignment
Order ID:89JHGSJE83839 Style:APA/MLA/Harvard/Chicago Pages:5-10 Instructions:
Project Management case study Assignment
INFO6011 – Project Management
Assignment 2
Marks 20
Time – 1 week
Assignment Objectives:
- Create a project charter for the case study given to you in class.
Requirements:
- This is an individual assignment
- Use the template provided.
- Ensure you provide thorough content for each section of the charter.
- Do not just regurgitate the information in the case study. You will need to think about the project request and determine the scope deliverables and milestones beyond the obvious.
- Download the following template files from FOL:
- Project Charter Template
- You must rename your file with your name + “-project charter” e.g. “bobsmith-project charter.doc” and then submit your document electronically using the Fanshawe Online dropbox. Do NOT zip or compress the files.
- Zipped or compressed files will receive a zero grade.
Any plagiarism will receive an academic offense and the appropriate penalty.
Project Management case study Assignment
RUBRIC
Excellent Quality
95-100%
Introduction 45-41 points
The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned.
Literature Support
91-84 points
The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned.
Methodology
58-53 points
Content is well-organized with headings for each slide and bulleted lists to group related material as needed. Use of font, color, graphics, effects, etc. to enhance readability and presentation content is excellent. Length requirements of 10 slides/pages or less is met.
Average Score
50-85%
40-38 points
More depth/detail for the background and significance is needed, or the research detail is not clear. No search history information is provided.
83-76 points
Review of relevant theoretical literature is evident, but there is little integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are included. Summary of information presented is included. Conclusion may not contain a biblical integration.
52-49 points
Content is somewhat organized, but no structure is apparent. The use of font, color, graphics, effects, etc. is occasionally detracting to the presentation content. Length requirements may not be met.
Poor Quality
0-45%
37-1 points
The background and/or significance are missing. No search history information is provided.
75-1 points
Review of relevant theoretical literature is evident, but there is no integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are not included in the summary of information presented. Conclusion does not contain a biblical integration.
48-1 points
There is no clear or logical organizational structure. No logical sequence is apparent. The use of font, color, graphics, effects etc. is often detracting to the presentation content. Length requirements may not be met
You Can Also Place the Order at www.collegepaper.us/orders/ordernow or www.crucialessay.com/orders/ordernow Project Management case study Assignment