Order ID:89JHGSJE83839 | Style:APA/MLA/Harvard/Chicago | Pages:5-10 |
Instructions:
5.3 Discussion Board: Project Monitoring and Systems Topic 2
Topic 2: Project Control System
A small technology consulting company, specializing in developing manufacturing software for the home construction industry, secured a large contract a year ago to develop a software for designing and manufacturing roof truss. The development contract was for two years, and the maintenance contract was for five years. As part of the contract, the client included a 0.8 percent penalty per month for each additional month beyond the development contract end date of the software development project. Project progress reports indicate that the software development project is about 60 percent complete, seems to be encountering various problems, and it is behind schedule. The consequence of this is that the company could potentially lose money if the 0.8 percent performance penalty is invoked. The managing partner, in charge of the project, was able to trace some of the problems to poor quality control, not enough experienced software engineers, and unnecessary testing of incomplete software codes. Although you are not the project manager for this project, but because of your experience, the managing partner in charge of the project has directed you to develop a better system of project control for the software development project. Discuss how you plan to complete this task.
Initial posts should be 350 words minimum
Initial posts should include at least two peer-reviewed article/journal/book as a citation (not including
the course textbook)
Use APA formatting to cite all of your sources:
https://owl.purdue.edu/owl/research_and_citation/apa_style/apa_formatting_and_style_guide/
general_format.html (Links to an external site.)
You can access the databases of peer-reviewed journals here:
https://libguides.lib.fit.edu/business (Links to an external site.)
https://libguides.lib.fit.edu/InformationTechnology
RUBRIC |
||||||
Excellent Quality 95-100%
|
Introduction
45-41 points The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned. |
Literature Support 91-84 points The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned. |
Methodology 58-53 points Content is well-organized with headings for each slide and bulleted lists to group related material as needed. Use of font, color, graphics, effects, etc. to enhance readability and presentation content is excellent. Length requirements of 10 slides/pages or less is met. |
|||
Average Score 50-85% |
40-38 points More depth/detail for the background and significance is needed, or the research detail is not clear. No search history information is provided. |
83-76 points Review of relevant theoretical literature is evident, but there is little integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are included. Summary of information presented is included. Conclusion may not contain a biblical integration. |
52-49 points Content is somewhat organized, but no structure is apparent. The use of font, color, graphics, effects, etc. is occasionally detracting to the presentation content. Length requirements may not be met. |
|||
Poor Quality 0-45% |
37-1 points The background and/or significance are missing. No search history information is provided. |
75-1 points Review of relevant theoretical literature is evident, but there is no integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are not included in the summary of information presented. Conclusion does not contain a biblical integration. |
48-1 points There is no clear or logical organizational structure. No logical sequence is apparent. The use of font, color, graphics, effects etc. is often detracting to the presentation content. Length requirements may not be met |
|||
You Can Also Place the Order at www.collegepaper.us/orders/ordernow or www.crucialessay.com/orders/ordernow |
Project Monitoring and Systems Topic 2