Explain why Integrated Change Management is an important function within a project.
Describe some key aspects associated to Earned Value Management.
Evaluate a situation when you needed to forecast an outcome and explain which Earned Value Management closely resembles the processes that you may have experienced, and explain what the affected outcome was.
Introduction to Project Management Discussion Assignment
PART B
- Calculate the schedule variance and cost variance for the Bullwhip project?
2 Does Jimmy’s point about the material costs have merit? If so, does this have any implications for the way the earned valued is calculated at Peak?
- Who is right about the status of the project? Eric or Jimmy?
4 What advice, if any, would you offer Eric related to his new role of VP of Operations?
PArRT C
For this week’s Portfolio Project section, view and evaluate this video: Engineering Downtown – World Trade Center Development (approx. 5 mins – opens in a new window). As you have read from the lecture and watched in the video, project Monitoring and Controlling is to identify and regulate the following: 1. Change control 2. Scope analysis 3. Monitor current progress/risks/quality Based on what you viewed of this project, describe any special Monitoring and Controlling characteristics in place for controlling the scope, cost, or time factors in order to achieve the overall project objectives. This will be submitted as a Word essay of at least 250 words
Introduction to Project Management Discussion Assignment
RUBRIC
Excellent Quality
95-100%
Introduction 45-41 points
The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned.
Literature Support
91-84 points
The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned.
Methodology
58-53 points
Content is well-organized with headings for each slide and bulleted lists to group related material as needed. Use of font, color, graphics, effects, etc. to enhance readability and presentation content is excellent. Length requirements of 10 slides/pages or less is met.
Average Score
50-85%
40-38 points
More depth/detail for the background and significance is needed, or the research detail is not clear. No search history information is provided.
83-76 points
Review of relevant theoretical literature is evident, but there is little integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are included. Summary of information presented is included. Conclusion may not contain a biblical integration.
52-49 points
Content is somewhat organized, but no structure is apparent. The use of font, color, graphics, effects, etc. is occasionally detracting to the presentation content. Length requirements may not be met.
Poor Quality
0-45%
37-1 points
The background and/or significance are missing. No search history information is provided.
75-1 points
Review of relevant theoretical literature is evident, but there is no integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are not included in the summary of information presented. Conclusion does not contain a biblical integration.
48-1 points
There is no clear or logical organizational structure. No logical sequence is apparent. The use of font, color, graphics, effects etc. is often detracting to the presentation content. Length requirements may not be met
You Can Also Place the Order at www.collegepaper.us/orders/ordernow or www.crucialessay.com/orders/ordernow Introduction to Project Management Discussion Assignment
Introduction to Project Management Discussion Assignment