Effective Project Management Assignment Help
Order ID:89JHGSJE83839 Style:APA/MLA/Harvard/Chicago Pages:5-10 Instructions:
Effective Project Management Assignment Help
Create a team agreement that outlines the team operating rules for the construction project you are managing.
What is the impact on a project schedule when you level your resources? Why is resource leveling necessary and what is the impact on your resources when you do not level? Review the Agile manifesto and describe how Agile views resource leveling?
Part 2:
Describe the purpose of a status report to the project sponsor? What key information do you feel is important for the status report to include and why? What is the optimum reporting cadence and why? What factors do Project Managers need to think about when creating a status report template? Do you feel that status reports are only needed when managing waterfall projects, and why? How can project status be shared in an Agile or Hybrid project?
Part 3: You are a project manager for a construction project budgeted at $750,000. As of today, the project should be 45% completed but after reviewing the status of the scheduled tasks involved in the project it is evident that only 25% of the work has been completed. The team has spent $200,000 thus far. Answer the two questions below: 1. Describe the formula for each equation and provide the answer
Determine Earned Value (EV)
Determine Planned Value (PV)
Determine Cost Performance Index (CPI)
Determine Schedule Performance Index (SPI)
Cost Variance (CV)
Schedule Variance (SV)
- What does this data tell you?
Text-
Title: Effective Project Management ISBN: 9781119562801 Authors: Robert K. Wysocki Publisher: Wiley Publication Date: 2019-05-07 Edition: 8th Edition
RUBRIC
Excellent Quality
95-100%
Introduction 45-41 points
The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned.
Literature Support
91-84 points
The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned.
Methodology
58-53 points
Content is well-organized with headings for each slide and bulleted lists to group related material as needed. Use of font, color, graphics, effects, etc. to enhance readability and presentation content is excellent. Length requirements of 10 slides/pages or less is met.
Average Score
50-85%
40-38 points
More depth/detail for the background and significance is needed, or the research detail is not clear. No search history information is provided.
83-76 points
Review of relevant theoretical literature is evident, but there is little integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are included. Summary of information presented is included. Conclusion may not contain a biblical integration.
52-49 points
Content is somewhat organized, but no structure is apparent. The use of font, color, graphics, effects, etc. is occasionally detracting to the presentation content. Length requirements may not be met.
Poor Quality
0-45%
37-1 points
The background and/or significance are missing. No search history information is provided.
75-1 points
Review of relevant theoretical literature is evident, but there is no integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are not included in the summary of information presented. Conclusion does not contain a biblical integration.
48-1 points
There is no clear or logical organizational structure. No logical sequence is apparent. The use of font, color, graphics, effects etc. is often detracting to the presentation content. Length requirements may not be met
You Can Also Place the Order at www.collegepaper.us/orders/ordernow or www.crucialessay.com/orders/ordernow Effective Project Management Assignment Help
Effective Project Management Assignment Help