GBA334 First Step in Planning and Scheduling A Project
Question
Question 1. The first step in planning and scheduling a project is to develop the __________.
Student Answer:
employee scheduling plan
PERT/CPM network diagram
critical path
work breakdown structure
variance calculations for each activity
Question 2. The critical path of a network is the:
Student Answer:
shortest time path through the network.
path with the fewest activities.
path with the most activities.
longest time path through the network.
none of the above.
Question 3. PERT:
Student Answer:
assumes that we do not know ahead of time what activities must be completed.
assumes that activity time estimates follow the normal probability distribution.
is a network technique that uses three time estimates for each activity in a project. is a deterministic network technique that allows for project crashing. None of the above is correct.