Order ID:89JHGSJE83839 | Style:APA/MLA/Harvard/Chicago | Pages:5-10 |
Instructions:
Paper on Project Management
look for a current article about project management. Conflict resolution and negotiating skills, project budgeting, risk management, project scheduling and resource management, and project monitoring and control are all examples of this. When putting together your article analysis, keep these themes and questions in mind.
After you’ve finished reading the article, write a summary of the main points.
Consider the author’s point of view on project management.
What is your perspective of the function of project management inside an organization, and ultimately, of the project manager as it relates to project completion, after reading this article and applying the skills obtained in this course?
Your response should be at least two paragraphs long and double-spaced. The article reference from the CSU online library (mandatory) should be followed by one additional reputable reference. All sources must be cited, including paraphrased and quoted material, which must be accompanied by citations and cited according to APA criteria.
RUBRIC |
||||||
Excellent Quality 95-100%
|
Introduction
45-41 points The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned. |
Literature Support 91-84 points The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned. |
Methodology 58-53 points Content is well-organized with headings for each slide and bulleted lists to group related material as needed. Use of font, color, graphics, effects, etc. to enhance readability and presentation content is excellent. Length requirements of 10 slides/pages or less is met. |
|||
Average Score 50-85% |
40-38 points More depth/detail for the background and significance is needed, or the research detail is not clear. No search history information is provided. |
83-76 points Review of relevant theoretical literature is evident, but there is little integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are included. Summary of information presented is included. Conclusion may not contain a biblical integration. |
52-49 points Content is somewhat organized, but no structure is apparent. The use of font, color, graphics, effects, etc. is occasionally detracting to the presentation content. Length requirements may not be met. |
|||
Poor Quality 0-45% |
37-1 points The background and/or significance are missing. No search history information is provided. |
75-1 points Review of relevant theoretical literature is evident, but there is no integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are not included in the summary of information presented. Conclusion does not contain a biblical integration. |
48-1 points There is no clear or logical organizational structure. No logical sequence is apparent. The use of font, color, graphics, effects etc. is often detracting to the presentation content. Length requirements may not be met |
|||
You Can Also Place the Order at www.collegepaper.us/orders/ordernow or www.crucialessay.com/orders/ordernow |
Paper on Project Management