Project Network Planning Assignment
Order ID:89JHGSJE83839 Style:APA/MLA/Harvard/Chicago Pages:5-10 Instructions:
Project Network Planning Assignment
Project Networking provides the necessary tools to monitor project progress. Considerable time and effort is expended developing successful project networks.
Refer to exercise 9 in chapter 6 of the textbook. Read the assignment thoroughly and analyze the data provided in the diagram.
Compute the project network sequence and proper timing to complete the project using an excel spreadsheet, PowerPoint, or another appropriate form of delivery method. Address all required information in the description presented in exercise 9. In addition, respond to the following questions (300-500 words):
- Provide the Early Start Time(EST), Early Finish Time (EFT), Late Start Time (LST), and Late Finish Time(LFT) for each activity. Compute the Total Slack for each activity. Determine which activities are on the critical path. How long will it take to complete the project?
- An activity that is on the critical path for this project has increased by 7. Will the project end date be delayed? If so, by how much?
APA format is not required, but solid academic writing is expected. Include at least two properly cited academic sources to support your facts. This exercise is worth 30 points.
Project Network Planning Assignment
Exercise 9
You are creating a customer database for the Hillsboro Hops minor league baseball team. Draw a project network given the information in the table that follows. Complete the forward and backward pass, compute activity slack, and identify the critical path. How long will this project take? How sensitive is the network schedule? Calculate the free slack and total slack for all noncritical activities.
ID Description Predecessor Time (days)
A Systems design None 2
B Subsystem A design A 1
C Subsystem B design A 1
D Subsystem C design A 1
E Program A B 2
F Program B C 2
G Program C D 2
H Subsystem A test E 1
I Subsystem B test F 1
J Subsystem C test G 1
K Integration H, I, J 3
L Integration test K 1
To get your Project Network Planning Assignment done, please click on https://academicessayist.com/orders/ordernow
RUBRIC
Excellent Quality
95-100%
Introduction 45-41 points
The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned.
Literature Support
91-84 points
The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned.
Methodology
58-53 points
Content is well-organized with headings for each slide and bulleted lists to group related material as needed. Use of font, color, graphics, effects, etc. to enhance readability and presentation content is excellent. Length requirements of 10 slides/pages or less is met.
Average Score
50-85%
40-38 points
More depth/detail for the background and significance is needed, or the research detail is not clear. No search history information is provided.
83-76 points
Review of relevant theoretical literature is evident, but there is little integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are included. Summary of information presented is included. Conclusion may not contain a biblical integration.
52-49 points
Content is somewhat organized, but no structure is apparent. The use of font, color, graphics, effects, etc. is occasionally detracting to the presentation content. Length requirements may not be met.
Poor Quality
0-45%
37-1 points
The background and/or significance are missing. No search history information is provided.
75-1 points
Review of relevant theoretical literature is evident, but there is no integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are not included in the summary of information presented. Conclusion does not contain a biblical integration.
48-1 points
There is no clear or logical organizational structure. No logical sequence is apparent. The use of font, color, graphics, effects etc. is often detracting to the presentation content. Length requirements may not be met