Work Breakdown Structure to Create a Gantt Chart
Criminal Law Discussion
Note: Examples and instructions are listed in blue throughout the document. Before turning in your project plan, delete the blue instructions in each section, and change the font color back to black so the final product looks professional.
SUBJECT: FAST TRACK CLINIC
Table of Contents
Assumptions and Risk Analysis (Week Four)4
Risk Analysis and Mitigation. 4
Note: After you have completed each section of your plan, you can update the Table of Contents automatically under the References tab in the toolbar of Word. In the Table of Contents section choose Update Table.
Provide the proposed mission statement.
(Remember to remove all blue text from the document. These are merely directions and suggestions for the document.)
Example: Reduce the number of falls in the inpatient setting by removing furniture clutter in the patient rooms.
The objectives of the project are as follows:
[Insert Objective 1]
[Insert Objective 2]
[Add additional objectives as necessary.]
Section 2: Work Breakdown Structure
Develop a work breakdown structure that identifies a minimum of six major tasks or components you will need to accomplish for the project stated in the assigned scenario.
Complete the table below with a listing of the major components of the work breakdown structure. Add rows as necessary.
Level | Activities |
1.0 | Administration |
1.1 | Review state inspection report |
1.2 | Review state compliance standards |
Use your Work Breakdown Structure to create a Gantt chart for your selected scenario.
Section 4: Resource Utilization
Describe how this project will be funded (e.g., operational budget, grant funds, donations, loans, etc.).
List your projected revenue, then list expenses by the major category. Expenses already listed in the chart are examples and may change based on your particular project.
Revenue | $62,000 |
Expenses | |
Salary expenses | $13,000 |
Equipment costs | |
Contractual services | |
Supplies | |
Section 5: Assumptions and Risk Analysis
List any statements believed to be true and from which a conclusion was drawn to define this project plan.
Example: Unavailability of suitable lease space may delay project deliverables. Possible mitigation strategy: Work with a realtor to identify and screen lease space options as early as possible. List risks that the approving body (Governing Board) should be aware of before making a decision, including the risk of not funding the project.
Add as many rows in the table as necessary.
Risk | Mitigation |
Work Breakdown Structure to Create a Gantt Chart
RUBRIC |
||||||
Excellent Quality 95-100%
|
Introduction
45-41 points The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned. |
Literature Support 91-84 points The background and significance of the problem and a clear statement of the research purpose is provided. The search history is mentioned. |
Methodology 58-53 points Content is well-organized with headings for each slide and bulleted lists to group related material as needed. Use of font, color, graphics, effects, etc. to enhance readability and presentation content is excellent. Length requirements of 10 slides/pages or less is met. |
|||
Average Score 50-85% |
40-38 points More depth/detail for the background and significance is needed, or the research detail is not clear. No search history information is provided. |
83-76 points Review of relevant theoretical literature is evident, but there is little integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are included. Summary of information presented is included. Conclusion may not contain a biblical integration. |
52-49 points Content is somewhat organized, but no structure is apparent. The use of font, color, graphics, effects, etc. is occasionally detracting to the presentation content. Length requirements may not be met. |
|||
Poor Quality 0-45% |
37-1 points The background and/or significance are missing. No search history information is provided. |
75-1 points Review of relevant theoretical literature is evident, but there is no integration of studies into concepts related to problem. Review is partially focused and organized. Supporting and opposing research are not included in the summary of information presented. Conclusion does not contain a biblical integration. |
48-1 points There is no clear or logical organizational structure. No logical sequence is apparent. The use of font, color, graphics, effects etc. is often detracting to the presentation content. Length requirements may not be met |
|||
![]() |
![]() |
|||||
![]() |
![]() |
![]() |
||||
You Can Also Place the Order at www.collegepaper.us/orders/ordernow or www.crucialessay.com/orders/ordernow
Work Breakdown Structure to Create a Gantt Chart |
Work Breakdown Structure to Create a Gantt Chart